ChallengesJune 2013 was an exceptionally hot month, so first off the weather was not cooperative at least not as far as the temperature was concerned. However, the skies were clear and the days were long, so that helped compensate for the heat.
The New Boston Elementary school was probably the hardest shoot. It was right up against a hill, it was an architecturally complex building, the layout was curved and right in the middle of a neighborhood. So, finding the right locations and altitude/angles was a little tough. The Clay HS was not as difficult as New Boston but it faced a highway which limited our locations. Portsmouth West Middle school was open on all sides but was not as interesting as the other schools. In addition to the aerial photographs we took pictures for approximately 10 panoramas and some video snippets as well. |
|
|
|
|
Whats Going On? |
UAV News |
Contact Us |